A few adjustments to the columns today, especially to the column at the west. Jose and Israel took down rocks at the top and rebuilt it to try to make the angles better, but it still looks like it tilts south. Then they prepared the forms for the concrete wall and column caps. The three low voltage lights were installed under the caps and the wires were attached to the existing ballast.
No comments:
Post a Comment