Jose and Israel, the Pacific Pavingstone masons, arrived on schedule at 7am. They started where they had left off, working on the 2 stone columns. Each rock has to be carefully selected for shape, size and color. Then it is placed into the jigsaw puzzle which will become the columns.
Later in the day they put the first coat of stucco on the 18-inch sitting wall and ran electrical wire for the 5 low voltage lights.
No comments:
Post a Comment